Twin 7.8m New builds
Another successful handover done to a very high-end commercial customer.
These specific Fluid 780’s are equipped with Heavy Duty removable / slide on Hypalon tubes and a completely Custom Finite Element Analysed Single Point Lift system to suit the predetermined LCG of these boats.
The difference in total weight of these 2 x Fluid 780’s? A mere 26lbs …
|