Our new Moorings are being laid early April, so have made a week free to work on the Pac /to get it finished..... Its also due to do a weeks filming work end of May, so pressures on a bit!
Not quite sure why, but have also lined up another project for next winter in the shape of Chewy's Atlantic, which we'll be collecting next month and which eventually will be based down in Milford next year for a monitoring project we have down there /which is stepping up a gear...
SO... time to get the Pac wired up (last job)....have removed the rear seat pods and floor to run cables today, and a big box of electrical goodies has just arrived.... But thought I'd post up a couple of pics showing the progress we've made.... upholstery /jockey seat backs etc are missing in the pics, as are the rear seat pods and control panel (just been epoxy 2 pac'd).... Pretty pleased with how shes looking.... Will post up some better shots when she is wired up /done...