Go Back   RIBnet Forums > RIB talk > RIBs & ribbing
Click Here to Login

Reply
 
Thread Tools Search this Thread
 
Old 18 March 2011, 06:24   #21
Member
 
Leapy's Avatar
 
Country: UK - England
Town: Sheepy Parva
Boat name: Sadly Sold
Length: no boat
Join Date: Sep 2008
Posts: 1,731
Quote:
Originally Posted by willk View Post
I'm with you Leapy - Something's off.
Sceptics R Us
__________________
Leapy is offline   Reply With Quote
Old 18 March 2011, 10:01   #22
Member
 
HUMBER P4VWL's Avatar
 
Country: UK - Wales
Town: N Wales Chester
Boat name: Mr Smith
Make: Humber
Length: 6m +
Join Date: Feb 2009
Posts: 5,238
Anything to do with winning the Olympic contract to supply boats?

Maybe private purchase is not their priority now.

Purely speculation, but if that's the case it isn't a good business strategy long term.
__________________
HUMBER P4VWL is offline   Reply With Quote
Old 18 March 2011, 12:42   #23
Member
 
Country: UK - England
Make: Ribcraft
Length: 6m +
Engine: Suzuki 225 Hp
Join Date: Jun 2010
Posts: 22
Quote (email received 29 September last) after asking for going from 175 to 225HP engine.


........

Yes we have got a big contract for next year although I can’t say what its for. Your build is going through at the moment so it wouldn’t effect you.



The large order production is running from January to May and we have a spare workshop where we have set up separate tooling so it wouldn’t effect delivery even if yours were due in that time. Small world how did you hear of that?



Best Regards

........

Seems I am in the middle of it. Altrough they tell me now it will take 4 weeks to complete (have seen some pictures now).

Cheers

Q.
__________________
TopQ1967 is offline   Reply With Quote
Old 18 March 2011, 12:58   #24
Member
 
Simon B's Avatar
 
Country: UK - England
Town: Leicester
Boat name: Vixen
Make: Ribcraft
Length: 6m +
Engine: Suzuki OB 175
MMSI: 235071839
Join Date: Jun 2004
Posts: 1,624
Single orders seem to get shoved in here and there with Ribcraft, we heard nothing for ages about our boat then it was built quickly (but to their high build quality) near the delivery date. Once built they wanted us to pay for it and collect it PDQ, this caused us some challenges but we did it in the end.

They were looking at some big UN contract then, sadly it's business, I imagine if we'd wanted something all touchy feely etc etc we could have gone elsewhere. Still very happy with our boat and for us the 175 is performing well, remember the 175 2.8 has the largest displacement for its class (suzzy blurb) and it's electronics optimise the low end grunt (as I found out, almost dumping my mate over the transom)

If we had not gone the suzzy route I would have looked hard at Etecs.
__________________
New boat is here, very happy!
Simon
www.luec.org
Simon B is offline   Reply With Quote
Old 18 March 2011, 13:23   #25
RIBnet admin team
 
willk's Avatar
 
Country: Ireland
Length: 4m +
Join Date: Feb 2008
Posts: 14,898
Posted last Autumn, my highlighting...
Quote:
Originally Posted by TopQ1967 View Post
Hi

The new build of my Ribcraft 6.8 is progressing slowly (particially because of me adding bits and pieces).

I like to install 2x VHF units and the biggest plotter possible. I am now looking for sample console layouts and advice. Any help is apriciated.

Regards

Q.
Now:
Quote:
Originally Posted by TopQ1967 View Post
I ordered a 6.8 Ribcraft back in July last year (had good advice on this forum). Due to all kind of problems (on sellers side) delivery was postponed time by time.
I think you RIBnet lads are getting too wound up early in the game.
__________________
willk is offline   Reply With Quote
Old 18 March 2011, 14:01   #26
Member
 
Country: UK - England
Make: Ribcraft
Length: 6m +
Engine: Suzuki 225 Hp
Join Date: Jun 2010
Posts: 22
I don’t want to end this in a bun fight as I hear only praises about the good stuff Ribcraft is delevering. Therefor I accepted (the first few) postponed delivery dates. However I had to find out myself delivery was not as planned.

Problem in engine is solved so topic can be closed.



In reaction of previous mail:

Ordered boat July (downpayment made) --> Delevery at Boatshow Southampton.

Problems in mould delivery postponed.. (without noticing me, I had to ask myself)

Due to delivery postponed I added some goods (adding 4 extra patches and a front samson pole (how hard can this be).

Afterwards delivery was postponed time by time.

Changed bonded to detachable 2nd row seats (perhaps more serious, but still no work was done to my boat at that time).

Rest as above already mentioned. (from end of September on / no further changes in spec)..


So Indeed I changed some specs…

Q.
__________________
TopQ1967 is offline   Reply With Quote
Reply


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off




All times are GMT. The time now is 08:22.


Powered by vBulletin® Version 3.8.8 Beta 1
Copyright ©2000 - 2024, vBulletin Solutions, Inc.