SR4 Deluxe - Refurb/Upgrade
First RIB
First test day
Battery box with deck fittings in place and sealed
Kill switch on console panel - radio sealed off
Kill switch connections and steering
Wiring loom tidied up and protected from Water
New gear cable fitted and kill switch wired to ignition cut off wire
A-Frame and accessories fitted
A-Frame Drilled and fitted with Nav lights, radio arial and later GPS antenna
Conduit piping to protect wiring loom
Console fitting Deck
Console fitting switch panel and steering wheel
Console fittiing GPS and Depth sounder
Console fitting gear control box
Gear control box repair
Console fitting radio
New console fitting
Deck clearance
Spray deck removal
Spray deck removal
Console dash removal
Seat removal
Old console and spray deck removed
Spray deck removed - Kind of
Just home 
 
Next Plans are: 
 
-Clean 
-Remove Old console and seats 
-clean again 
-Purchase and fit new console and instruments 
-refurb hull
just home
just home
just collecting
Just collecting


All times are GMT. The time now is 05:38.


Powered by vBulletin® Version 3.8.8 Beta 1
Copyright ©2000 - 2024, vBulletin Solutions, Inc.